Service line from pump house was replaced. East Lateral/Reverse Stubb Ditch is OFF – lateral leaking & needs repaired – MCID/will be mostly shut down...
Archive for month: September 2016
P5 – 29 1/2 Rd Back in Service 9-12-2016 14:30
Lateral P5, serving the area along 29 1/2 Rd north of Patterson, is back in service after repairs were completed this afternoon (9-12-16) following a...
Box87/89-Private [old box 92] / lower end below RR tracks is ON – [09/14/16 @ 0915]
Box87/89-Private [old box 92] / lower end below RR tracks is ON – [09/14/16 @ 0915] Box87-Private [old box 92] / lower end below RR...
P6 is ready to be turned ON – 29 1/4 Rd, south of F/Patterson Rd [090816 – 0930am]
P6 is ready to be turned ON – 29 1/4 Rd, south of F/Patterson Rd [090816 – 0930am] – red tag may be removed &...