PIPL – Main St, East on Third St – ON [05/20/22 – 1700/5pm] PIPL – Main St, East on Third St – OFF – for...
Archive for year: 2022
P6-ON – between 29-29 1/2 Rds [051722/1PM] – start filling
P6-OFF – for repair – between 29-29 1/2 Rds [051722/AM] – should be back on Tuesday 5/17 PM – repair complete 1pm
P6-West side of Redwing – OFF – due to flooding [0418/22]
P6-West side of Redwing – OFF – due to flooding [0418/22] – no point of contact for west side – someone needs to call...
P3- south of F Rd – OFF – repair [041922-0857]
P3- south of F Rd – OFF – repair [041922-0857] –
PIP&L – 4/22 Water In info
PIP&L – 4/22 Water In info 4/18/22 – start filling Main & Kluge laterals 4/xx/22 – start the Kluge to Iowa south of Fourth St...
- 1
- 2